Esso Plant
Furmanite turn up the heat for Esso
CUSTOMER: Esso Plant in Ingolstadt, Germany
The Esso process and refining plant based at Ingolstadt in Germany, required a dedicated heat exchanger designed in a U-shaped configuration for their planned shutdown/start up. The problem was that their existing heat exchanger failed and needed replacing. To keep the planned shutdown on schedule they needed the new exchanger in double quick time – just six weeks, when the normal production lead-time is closer to three to four months.